POWER-CAGE
TRUCK, BUS AND TRAILER HEAVY DUTY REPAIR SYSTEM

- The damaged chassis is anchored to the pulling towers.
- The chassis is straightened rapidly and precisely.
- Standard tower extension enables you to pull 3,5m above the runway and high tower extension up to 4,3m.
- Pulling towers are moved and positioned easily in 3 directions (lengthways, widthways, diagonally) due to the use of ball bearing slide assemblies.
Up to 4 main sets:
Lateral towers: | 8 |
End towers: | 2 |
Runway length: | 11 meters |
Overall length: | 12.5 meters |
Pit recommended: | Yes |
A number of different modules available up to 22 meters in length